1, before installing the automatic sawing machine, the first place in the workshop excavation lifting platform geosyncline, its length and position needs to be customized according to the size. In addition, the installation must be confirmed before the machine parts are complete, the necessary installation tools are ready.
2, after the completion of the installation on the spot to adjust the measurement, to ensure the normal operation of the machine, and test the quality of the plate edge can be.
This is the automatic edge sawing machine before and after the installation of the work, pay attention to these, in order to ensure that the machine is more efficient installation, more quickly put into use.
|